Jump to 0 top | 1 navigation | 2 content | 3 extra information (sidebar) | 4 footer | 5 toolbar


Content

000-102 study materials

Test 000-102: High Availability for AIX - Technical Support and Administration
Test information:
Number of questions: 78
Time allowed in minutes: 120
Required passing score: 56%
Test languages: English
 
Note: There are 78 scored items and 3 unscored items.
 
Sample / Assessment test:
 Test your knowledge prior to taking the test. 
 
Related  IBM certifications:
 IBM Certified Systems Expert - High Availability for AIX Technical Support and Administration

000-102 Objectives
Planning (18%)

Use online planning worksheet
Design a cluster with suitable hardware and to eliminate SPOFs
Identify need for IPAT and which method of IPAT is approriate
Evaluate cluster security requirements
Determine interdependencies of cluster components
Determine other application requirements for cluster integration
Determine AIX pre-reqs (e.g. IP and network configuration, host file configuration, software version and components, storage components, OS level, required filesets, MPIO)
Identify when XD or Cross-site LVM may be required
Plan a cluster within a virtualized environment
Installation and Configuration (24%)

Certinside offer free exam demo, and the products in certinside are all with high quality and low price! Welcome to certinside!

  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • 0 ratings

000-102 information

Test 000-102: High Availability for AIX - Technical Support and Administration
Test information:
Number of questions: 78
Time allowed in minutes: 120
Required passing score: 56%
Test languages: English
 
Note: There are 78 scored items and 3 unscored items.
 
Sample / Assessment test:
 Test your knowledge prior to taking the test. 
 
Related  IBM certifications:
 IBM Certified Systems Expert - High Availability for AIX Technical Support and Administration

000-102 Objectives
Planning (18%)

Use online planning worksheet
Design a cluster with suitable hardware and to eliminate SPOFs
Identify need for IPAT and which method of IPAT is approriate
Evaluate cluster security requirements
Determine interdependencies of cluster components
Determine other application requirements for cluster integration
Determine AIX pre-reqs (e.g. IP and network configuration, host file configuration, software version and components, storage components, OS level, required filesets, MPIO)
Identify when XD or Cross-site LVM may be required
Plan a cluster within a virtualized environment
Installation and Configuration (24%)

Certinside offer free exam demo, and the products in certinside are all with high quality and low price! Welcome to certinside!

  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • 0 ratings

000-102 exam

1. An administrator wants to install Web SMIT on a node that is not part of a cluster. Which PowerHA fileset provides this function?
A. cluster.sysmgt.wsm
B. cluster.es.client.wsm
C. cluster.es.server.websm
D. cluster.sysmgt.websm.rteWArialTimes New RomanZ
Answer: B   

2. A customer has a resource group rg1 configured on a two node cluster with the following policies:
The customer has observed the following scenarios as nodes join the cluster during cluster start up.
Scenario 1
Node1 joins cluster as first node - rg1 is acquired by Node1
Node2 joins cluster as second node - rg1 is moved from Node1 to Node2
Scenario 2
Node2 joins cluster as first node - rg1 is acquired by Node2
Node1 joins cluster as second node - rg1 remains on Node2
Which of the following is the reason for this behavior?
A. rg1 is configured with a delayed fallback timer
B. Settling time policy has not been configured for rg1
C. Node1 does not have sufficient resources to support rg1
D. Node2 is the first in the 'Default Node Priority' list for resource group rg1WArialTimes New RomanCourier NewZ
Answer: D   

3. An administrator is configuring an application monitor. Upon encountering an unrecoverable error the administrator does not want the resource group to failover.
How can the application monitor be configured to achieve this?
A. Configure the application monitor with a restart count of 0
B. Configure the application monitor with a monitor mode of Notify
C. Configure the application monitor with a notify method of Monitor
D. Configure the application monitor with a failure action of NotifyWArialTimes New RomanZ
Answer: D   

4. When does the Online Planning Worksheet tool run a validation?
A. When loading and activating a definition file into an inactive cluster
B. When exporting a definition to a cluster node or saving a definition file
C. When importing a definition from an active cluster or saving a definition file
D. When loading a definition into an active cluster or synchronizing a definition fileWArialTimes New RomanZ
Answer: C   

http://www.certinside.com/000-102.html

Click this link , you will find your best answers!

  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • No ratings
  • 0 ratings
Pages: 1 (1 - 3 / 3)